Illustrative aerial distribution facility at twilight with loading docks, trailers, circulation roads, parking, a highway, and landscaped ponds.

MARKETS / LOGISTICS + DISTRIBUTION

Movement shapes
the whole facility.

We plan the site and building around how goods actually move—from arrival and staging to storage and dispatch—so access, circulation, docks, and facility requirements work together from the start.

Illustrative aerial distribution facility at twilight with loading docks, trailers, circulation roads, parking, a highway, and landscaped ponds.

MARKETS / LOGISTICS + DISTRIBUTION

Movement shapes
the whole facility.

We plan the site and building around how goods actually move—from arrival and staging to storage and dispatch—so access, circulation, docks, and facility requirements work together from the start.

Illustrative aerial distribution facility at twilight with loading docks, trailers, circulation roads, parking, a highway, and landscaped ponds.

MARKETS / LOGISTICS + DISTRIBUTION

Movement shapes
the whole facility.

We plan the site and building around how goods actually move—from arrival and staging to storage and dispatch—so access, circulation, docks, and facility requirements work together from the start.

Illustrative logistics photography.
Not presented as KEYCO project work.

Illustrative logistics photography.
Not presented as KEYCO project work.

Illustrative logistics photography.
Not presented as KEYCO project work.

HOW IT WORKS

HOW IT WORKS

HOW IT WORKS

Follow the goods.

Follow the goods.

Follow the goods.

See the connections.

See the connections.

See the connections.

We start with how your operation needs to move—from site access and receiving
through staging, storage, and dispatch—then plan the facility around those connections.

We start with how your operation needs to move—from site access and receiving
through staging, storage, and dispatch—then plan the facility around those connections.

We start with how your operation needs to move—from site access and receiving
through staging, storage, and dispatch—then plan the facility around those connections.

SITE.

SITE.

SITE.

BUILDING.

BUILDING.

BUILDING.

OPERATIONS.

OPERATIONS.

OPERATIONS.

ALL CONNECTED.

ALL CONNECTED.

ALL CONNECTED.

Illustrative distribution facility at dusk, with loading docks, trucks and circulation areas.

01

01

01

Arrive & approach

Arrive & approach

Arrive & approach

SITE ACCESS / QUEUING / CIRCULATION

SITE ACCESS / QUEUING / CIRCULATION

02

02

02

Receive & hold

Receive & hold

Receive & hold

DOCK / STAGING / STORAGE

DOCK / STAGING / STORAGE

03

03

03

Prepare & dispatch

Prepare & dispatch

Prepare & dispatch

PICKING / OUTBOUND STAGING / DEPARTURE

PICKING / OUTBOUND STAGING / DEPARTURE

ONE OPERATION. SITE TO BUILDING.

ONE OPERATION. SITE TO BUILDING.

02 — SITE + CIRCULATION

02 — SITE + CIRCULATION

02 — SITE + CIRCULATION

The work starts
before the dock.

The work starts
before the dock.

The work starts
before the dock.

We plan access, circulation, staging, parking, and infrastructure as part of the operation—because the decisions outside the building shape how goods, vehicles, and people reach what happens inside.

We plan access, circulation, staging, parking, and infrastructure as part of the operation—because the decisions outside the building shape how goods, vehicles, and people reach what happens inside.

We plan access, circulation, staging, parking, and infrastructure as part of the operation—because the decisions outside the building shape how goods, vehicles, and people reach what happens inside.

ACCESS

ACCESS

CIRCULATION

CIRCULATION

STAGING

STAGING

PARKING

PARKING

INFRASTRUCTURE

INFRASTRUCTURE

Abstract site relationships showing access, queue, staging and dock approach; not engineering or construction documentation.

THE SITE
IS PART OF
THE OPERATION.

03 — FACILITY RESPONSE

03 — FACILITY RESPONSE

03 — FACILITY RESPONSE

Plan the building
for what’s next.

Plan the building
for what’s next.

Plan the building
for what’s next.

We design facilities that perform today and adapt tomorrow—aligning building layout, systems, and infrastructure with your operation’s evolving needs.

We design facilities that perform today and adapt tomorrow—aligning building layout, systems, and infrastructure with your operation’s evolving needs.

We design facilities that perform today and adapt tomorrow—aligning building layout, systems, and infrastructure with your operation’s evolving needs.

FLEXIBILITY

FLEXIBILITY

EFFICIENCY

EFFICIENCY

INTEGRATION

INTEGRATION

GROWTH

GROWTH

LONGEVITY

LONGEVITY

TODAY

Operational needs
shaped into design.

TOMORROW

Space to grow
without disruption.

Conceptual architectural study of a logistics facility, showing loading docks, trailers, storage racking, structure, and a translucent potential expansion volume. Not a verified KEYCO project.

A FACILITY
THAT ADAPTS
TO A CHANGING
TOMORROW.

Illustrative high-bay logistics interior with golden-hour loading docks and trailers

03

/

INSIDE THE FACILITY

INSIDE THE FACILITY

INSIDE THE FACILITY

Storage needs space.
Movement does too.

Storage needs space.
Movement does too.

Storage needs space.
Movement does too.

The storage plan belongs in the building conversation. Racking, aisle arrangements, equipment, clear height, and receiving and outbound staging can affect the structure, floor, and services around them.

The storage plan belongs in the building conversation. Racking, aisle arrangements, equipment, clear height, and receiving and outbound staging can affect the structure, floor, and services around them.

The storage plan belongs in the building conversation. Racking, aisle arrangements, equipment, clear height, and receiving and outbound staging can affect the structure, floor, and services around them.

KEEP THE WORKING ROUTES IN VIEW

Discuss how goods move between receiving, storage, preparation, and dispatch—and where those activities need room at the same time.

Discuss how goods move between receiving, storage, preparation, and dispatch—and where those activities need room at the same time.

Discuss how goods move between receiving, storage, preparation, and dispatch—and where those activities need room at the same time.

WHEN TEMPERATURE MATTERS

Cold or controlled storage adds requirements for enclosure, systems, and the movement of goods through doors. It is one project condition to resolve alongside the wider operation.

Cold or controlled storage adds requirements for enclosure, systems, and the movement of goods through doors. It is one project condition to resolve alongside the wider operation.

Cold or controlled storage adds requirements for enclosure, systems, and the movement of goods through doors. It is one project condition to resolve alongside the wider operation.

FACILITIES THAT KEEP COMMERCE IN MOTION.

FACILITIES THAT KEEP COMMERCE IN MOTION.

FACILITIES THAT KEEP COMMERCE IN MOTION.

Illustrative warehouse site study with truck circulation, loading docks, access, yard and future expansion
Illustrative warehouse site study with truck circulation, loading docks, access, yard and future expansion
Illustrative warehouse site study with truck circulation, loading docks, access, yard and future expansion

04

/

BEYOND STORAGE

BEYOND STORAGE

BEYOND STORAGE

More storage can
change more
than the floor plan.

More storage can
change more
than the floor plan.

More storage can
change more
than the floor plan.

Additional goods can mean more truck arrivals, more staging, and different demands at the docks. Early site and building decisions affect which changes can be accommodated later.

Additional goods can mean more truck arrivals, more staging, and different demands at the docks. Early site and building decisions affect which changes can be accommodated later.

Additional goods can mean more truck arrivals, more staging, and different demands at the docks. Early site and building decisions affect which changes can be accommodated later.

Look beyond the added space.

Look beyond the added space.

Look beyond the added space.

Consider how expansion may affect circulation, utilities, parking, dock access, and the parts of the site needed for construction.

Consider how expansion may affect circulation, utilities, parking, dock access, and the parts of the site needed for construction.

Consider how expansion may affect circulation, utilities, parking, dock access, and the parts of the site needed for construction.

Allow for a different pattern.

Allow for a different pattern.

Allow for a different pattern.

Changing equipment, product mix, or arrival schedules may alter how existing space is used—even when the building footprint stays the same.

Changing equipment, product mix, or arrival schedules may alter how existing space is used—even when the building footprint stays the same.

Changing equipment, product mix, or arrival schedules may alter how existing space is used—even when the building footprint stays the same.

TRUCK CIRCULATION

YARD EXPANSION

SITE ACCESS

FUTURE EXPANSION

During construction,
deliveries still arrive.

During construction,
deliveries still arrive.

During construction,
deliveries still arrive.

For an operating facility, identify which docks and access routes must remain available. Phasing yard work, temporary circulation, stored-goods boundaries, and expansion connections should be part of the construction conversation.

For an operating facility, identify which docks and access routes must remain available. Phasing yard work, temporary circulation, stored-goods boundaries, and expansion connections should be part of the construction conversation.

For an operating facility, identify which docks and access routes must remain available. Phasing yard work, temporary circulation, stored-goods boundaries, and expansion connections should be part of the construction conversation.

PLANS FOR WHAT’S NEXT.

PLANS FOR WHAT’S NEXT.

PLANS FOR WHAT’S NEXT.

LET’S BUILD TOGETHER

Let’s talk about
your next project.

Let’s talk about
your next project.

From distribution facilities to complex logistics environments, let’s discuss how KEYCO can help plan and deliver spaces built around operational demands.

START A CONVERSATION

PEOPLE BUILD OPPORTUNITY

PEOPLE BUILD OPPORTUNITY